Edge systems11 min5 September 2026

Edge bring-up checklist before field pilots

Before you ship edge hardware into a pilot site, lock power, thermal, connectivity, logging, update path, and failure behaviour — or the pilot will debug your lab debt.

By Axon Labs Engineering

Before you ship edge hardware into a pilot site, lock power, thermal, connectivity, logging, update path, and failure behaviour — or the pilot will debug your lab debt.

Key takeaways

  • Define power brownout behaviour in writing before install day.
  • Log what you will actually retrieve remotely — not what feels complete in the lab.
  • Name the update path and the rollback path.
  • Thermal limits should trip into safe states, not mysterious lag.
  • Pilot success metrics must be separable from install quality issues.

What should be done before an edge field pilot?

Power and thermal: what must be explicit?

Connectivity and offline behaviour

Update and rollback path

Pilot metrics vs install noise

What this checklist will not invent

Frequently asked questions

Sources